18 HAY’S MEWS W1

MAJOR REFURBISHMENT OF FIRST FLOOR MEWS APARTMENT 

OVER GARAGES IN THE MAYFAIR CONSERVATION AREA

 

 

STAGE 4 DESIGN COMPLETED | 2018

CONSTRUCTION ESTIMATE | £ 680,000

 

CLIENT | BERKELEY SQUARE HOLDINGS

PROJECT MANAGEMENT | ASTREA ASSET MANAGEMENT

PLANNING CONSENT | GEOFF BROWN STUDIO
ARCHITECTURE | GEOFF BROWN STUDIO

PARTY WALL SURVEYOR | TEN 1 SURVEYORS

STRUCTURAL ENGINEERING | PGCS PARTNERSHIP

BUILDING SERVICES | PETER DEER AND ASSOCIATES

ACOUSTIC CONSULTANCY | DEANE AUSTIN ASSOCIATES

COST CONSULTANCY | SAWYER AND FISHER

CDM ADVISER + PRINCIPAL DESIGNER | CDM SOLUTIONS

CONTRACTOR | NOT YET APPOINTED

 

GEOFF BROWN STUDIO TEAM:

GEOFF BROWN | GEORGE CORRIGAN | ANDRE LOBAO |

ANNA BOROWSKA 

 

PROJECT DESCRIPTION:

PLANNING PERMISSION TO PROVIDE A CONDENSER UNIT IN AN 

ACOUSTIC ENCLOSURE ON THE REAR PART OF THE ROOF IN THE 

MAYFAIR CONSERVATION AREA.
SCHEME FOR DISMANTLING THE ENTIRE FIRST FLOOR WALLS AND ROOF 
TO ENABLE RECONSTRUCTION OF A COMPLETELY RECONFIGURED APARTMENT LAYOUT.

ROOF VOID OVER THE OPEN PLAN LIVING AREA TO BE INCORPORATED INTO THE SPACE BY RAISING THE ROOF TIES AND EXPOSING THEM AS FEATURES.

THE PROJECT INVOLVES COMPLEX PARTY WALL NEGOTIATIONS WITH SEVERAL ADJOINING OWNERS.

PROJECT CURRENTLY AWAITING CLIENT INSTRUCTION TO MOVE

TO THE CONSTRUCTION PHASE