18 HAY’S MEWS W1
MAJOR REFURBISHMENT OF FIRST FLOOR MEWS APARTMENT
OVER GARAGES IN THE MAYFAIR CONSERVATION AREA
STAGE 4 DESIGN COMPLETED | 2018
CONSTRUCTION ESTIMATE | £ 680,000
CLIENT | BERKELEY SQUARE HOLDINGS
PROJECT MANAGEMENT | ASTREA ASSET MANAGEMENT
PLANNING CONSENT | GEOFF BROWN STUDIO
ARCHITECTURE | GEOFF BROWN STUDIO
PARTY WALL SURVEYOR | TEN 1 SURVEYORS
STRUCTURAL ENGINEERING | PGCS PARTNERSHIP
BUILDING SERVICES | PETER DEER AND ASSOCIATES
ACOUSTIC CONSULTANCY | DEANE AUSTIN ASSOCIATES
COST CONSULTANCY | SAWYER AND FISHER
CDM ADVISER + PRINCIPAL DESIGNER | CDM SOLUTIONS
CONTRACTOR | NOT YET APPOINTED
GEOFF BROWN STUDIO TEAM:
GEOFF BROWN | GEORGE CORRIGAN | ANDRE LOBAO |
ANNA BOROWSKA
PROJECT DESCRIPTION:
PLANNING PERMISSION TO PROVIDE A CONDENSER UNIT IN AN
ACOUSTIC ENCLOSURE ON THE REAR PART OF THE ROOF IN THE
MAYFAIR CONSERVATION AREA.
SCHEME FOR DISMANTLING THE ENTIRE FIRST FLOOR WALLS AND ROOF TO ENABLE RECONSTRUCTION OF A COMPLETELY RECONFIGURED APARTMENT LAYOUT.
ROOF VOID OVER THE OPEN PLAN LIVING AREA TO BE INCORPORATED INTO THE SPACE BY RAISING THE ROOF TIES AND EXPOSING THEM AS FEATURES.
THE PROJECT INVOLVES COMPLEX PARTY WALL NEGOTIATIONS WITH SEVERAL ADJOINING OWNERS.
PROJECT CURRENTLY AWAITING CLIENT INSTRUCTION TO MOVE
TO THE CONSTRUCTION PHASE