G e o f f B r o w n S t u d i o
32 HAY’S MEWS W1
REFURBISHMENT OF 2 APARTMENTS ABOVE GARAGES IN
RESIDENTIAL MEWS PROPERTY IN THE MAYFAIR
CONSERVATION AREA
COMPLETED | 2017
CONSTRUCTION VALUE | £ 929,000
CLIENT | BERKELEY SQUARE HOLDINGS
PROJECT MANAGEMENT | LANCER PROPERTY ASSET MANAGEMENT
PLANNING | GEOFF BROWN STUDIO
ARCHITECTURE | GEOFF BROWN STUDIO
CONTRACT ADMINISTRATION | GEOFF BROWN STUDIO
STRUCTURAL ENGINEERING | BRIDGES POUND
BUILDING SERVICES | PETER DEER AND ASSOCIATES
ACOUSTIC CONSULTANCY | EMTEC PRODUCTS
STRUCTURAL ENGINEERING | BRIDGES POUND
COST CONSULTANCY | SAWYER AND FISHER
CDM ADVISER + PRINCIPAL DESIGNER | ORSA PROJECTS
CONTRACTOR | KIND AND COMPANY [BUILDERS]
GEOFF BROWN STUDIO TEAM:
GEOFF BROWN | GIORGIO ANDREINI | ANNA BOROWSKA |
MARTINA RADOSOVSKA | ANDRE LOBAO
PROJECT DESCRIPTION:
PLANNING PERMISSION TO CREATE A NEW ENTRANCE TO THE
APARTMENTS DIRECTLY FROM HAY’S MEWS AND INSTALLATION
OF CONDENSERS IN AN ACOUSTIC ENCLOSURE IN A REAR
BASEMENT LIGHTWELL
COMPLETE GUT AND RECONSTRUCTION OF BOTH APARTMENT
INTERIORS TO CREAT NEW LAYOUTS WITH ENSUITE BATHROOMS
AND OPEN PLAN LIVING AND KITCHEN ACCOMMODATION.
THE FIRST FLOOR APARTMENT LIVING ACCOMMODATION WAS CREATED FROM TWO ROOMS AT DIFFERENT FLOOR LEVELS TO GENERATE AN ATTRACTIVE SPLIT LEVEL SPACE
THE ROOF VOID ABOVE THE SECOND FLOOR LIVING ROOM WAS
INCORPORATED INTO THE SPACE EXPOSING THE ORIGINAL TIE
BEAMS AS FEATURES IN THE ROOM
A NEW ENTRANCE HALL WAS CREATED WITHIN AN EXISTING
DOUBLE GARAGE FACNG HAY’S MEWS, AND A NEW ENTRANCE DOOR AND SIDE PANEL DESIGNED TO MAINTAIN THE CONSERVATION AREA MEWS CHARACTER OF GARAGE ENTRANCES