32 HAY’S MEWS W1

REFURBISHMENT OF 2 APARTMENTS ABOVE GARAGES IN 

RESIDENTIAL MEWS PROPERTY IN THE MAYFAIR 

CONSERVATION AREA 

 

COMPLETED | 2017

CONSTRUCTION VALUE | £ 929,000

 

CLIENT | BERKELEY SQUARE HOLDINGS

PROJECT MANAGEMENT | LANCER PROPERTY ASSET MANAGEMENT

PLANNING | GEOFF BROWN STUDIO
ARCHITECTURE | GEOFF BROWN STUDIO

CONTRACT ADMINISTRATION | GEOFF BROWN STUDIO

STRUCTURAL ENGINEERING | BRIDGES POUND

BUILDING SERVICES | PETER DEER AND ASSOCIATES

ACOUSTIC CONSULTANCY | EMTEC PRODUCTS

STRUCTURAL ENGINEERING | BRIDGES POUND

COST CONSULTANCY | SAWYER AND FISHER

CDM ADVISER + PRINCIPAL DESIGNER | ORSA PROJECTS

CONTRACTOR | KIND AND COMPANY [BUILDERS]

 

GEOFF BROWN STUDIO TEAM:

GEOFF BROWN | GIORGIO ANDREINI | ANNA BOROWSKA |

MARTINA RADOSOVSKA | ANDRE LOBAO

 

PROJECT DESCRIPTION:

PLANNING PERMISSION TO CREATE A NEW ENTRANCE TO THE 

APARTMENTS DIRECTLY FROM HAY’S MEWS AND INSTALLATION

OF CONDENSERS IN AN ACOUSTIC ENCLOSURE IN A REAR
BASEMENT LIGHTWELL

COMPLETE GUT AND RECONSTRUCTION OF BOTH APARTMENT

INTERIORS TO CREAT NEW LAYOUTS WITH ENSUITE BATHROOMS

AND OPEN PLAN LIVING AND KITCHEN ACCOMMODATION.

THE FIRST FLOOR APARTMENT LIVING ACCOMMODATION WAS CREATED FROM TWO ROOMS AT DIFFERENT FLOOR LEVELS TO GENERATE AN ATTRACTIVE SPLIT LEVEL SPACE

THE ROOF VOID ABOVE THE SECOND FLOOR LIVING ROOM WAS

INCORPORATED INTO THE SPACE EXPOSING THE ORIGINAL TIE

BEAMS AS FEATURES IN THE ROOM

A NEW ENTRANCE HALL WAS CREATED WITHIN AN EXISTING 

DOUBLE GARAGE FACNG HAY’S MEWS, AND A NEW ENTRANCE DOOR AND SIDE PANEL DESIGNED TO MAINTAIN THE CONSERVATION AREA MEWS CHARACTER OF GARAGE ENTRANCES