TILNEY HOUSE W1

REFURBISHMENT OF FOUR OFFICE FLOORS AND EXTERNAL
ELEVATIONS TO THIS MIXED-USE PERIOD BUILDING IN MAYFAIR

​

 

STAGE 3 DESIGN COMPLETED | 2020

CONSTRUCTION ESTIMATE | NOT DISCLOSED

 

CLIENT | STEPHANUS PROPERTIES

CLIENT REPRESENTATVE | HOLBEIN ANSTALT

CLIENT ADVISER | ASTREA ASSET MANAGEMENT

PLANNING | GEOFF BROWN STUDIO
ARCHITECTURE AND INTERIORS | GEOFF BROWN STUDIO

STRUCTURAL ENGINEERING | BRIDGES POUND

BUILDING SERVICES | PETER DEER AND ASSOCIATES

COST CONSULTANCY | RANDALL SIMMONDS

CDM ADVISER + PRINCIPAL DESIGNER | CDM SOLUTIONS

CONTRACTOR | NOT YET APPOINTED

 

GEOFF BROWN STUDIO TEAM:

GEOFF BROWN | ANDRE LOBAO | ANNA BOROWSKA 

 

PROJECT DESCRIPTION:

DESIGN SCHEME TO REFURBISH THE BASEMENT TO SECOND 

FLOORS USED AS THE CLIENT’S OWN OFFICES IN THIS MIXED 

USE PERIOD PROPERTY IN THE MAYFAIR CONSERVATION AREA.

PROJECT CURRENTLY AWAITING CLIENT INSTRUCTION TO
PROCEED TO DETAILED DESIGN.