
G e o f f B r o w n S t u d i o
TILNEY HOUSE W1
REFURBISHMENT OF FOUR OFFICE FLOORS AND EXTERNAL
ELEVATIONS TO THIS MIXED-USE PERIOD BUILDING IN MAYFAIR
STAGE 3 DESIGN COMPLETED | 2020
CONSTRUCTION ESTIMATE | NOT DISCLOSED
CLIENT | STEPHANUS PROPERTIES
CLIENT REPRESENTATVE | HOLBEIN ANSTALT
CLIENT ADVISER | ASTREA ASSET MANAGEMENT
PLANNING | GEOFF BROWN STUDIO
ARCHITECTURE AND INTERIORS | GEOFF BROWN STUDIO
STRUCTURAL ENGINEERING | BRIDGES POUND
BUILDING SERVICES | PETER DEER AND ASSOCIATES
COST CONSULTANCY | RANDALL SIMMONDS
CDM ADVISER + PRINCIPAL DESIGNER | CDM SOLUTIONS
CONTRACTOR | NOT YET APPOINTED
GEOFF BROWN STUDIO TEAM:
GEOFF BROWN | ANDRE LOBAO | ANNA BOROWSKA
PROJECT DESCRIPTION:
DESIGN SCHEME TO REFURBISH THE BASEMENT TO SECOND
FLOORS USED AS THE CLIENT’S OWN OFFICES IN THIS MIXED
USE PERIOD PROPERTY IN THE MAYFAIR CONSERVATION AREA.
PROJECT CURRENTLY AWAITING CLIENT INSTRUCTION TO
PROCEED TO DETAILED DESIGN.









